Placard reads:
AIRCRAFT WATER SYSTEM COLD WEATHER SERVICING AND FILLING INSTRUCTIONS WARNING: BEFORE OPENING CAP 1. CLOSE THE AIR SHUTOFF VALVE 2. RAISE SLOWLY AND CAREFULLY THE CAP LEVER TO RELEASE ALL THE AIR PRESSURE IN THE TANK 3. TURN AND OPEN THE CABIN FILLING CAP 4.FILL WITH POTABLE WATER ONLY. USE FUNNEL AS NECESSARY 5. AFTER CLOSING THE FILLING CAP ENSURE THAT THE CAP LEVEL IS LOWERED TO THE CLOSED POSITION 6.OPEN THE AIR SHUTOFF VALVE
| Fits | Gulfstream G200 |
|---|---|
| Location | Interior |
| Material | FAA-approved, fire-resistant Lexan, back-printed for maximum protection against scrapes and scratches to the ink |
| Serial number effectivity | Contact us to confirm for your serial number |
Printed and cut in-house in Leesburg, Florida by First Class Aerospace on FAA-approved, fire-resistant Lexan. Every placard is back-printed, so the ink is protected from scrapes and scratches. Made to match the original placard’s wording and color. Need a different color or a custom placard? Request a quote.






Reviews
There are no reviews yet.